Services

    Structural Design

  • Structural analysis, design, and detailing of all types of structures
  • Expertise in the field of seismic engineering

  • Structural Design of Demanding structures

  • High-rise structures
  • Long-span structures
  • Pedestrian bridges
  • Reservoirs
  • Retaining structures for deep excavations

  • Seismic Strengthening of Structures

  • Strengthening of RC elements using CFRP applications
  • Conventional strengthening.
  • External pre-stressing solutions

  • Engineering Consultancy Services

  • Review and structural designs check
  • Re-design and providing of alternative structural solutions

Completed projects - Samples of Analytical Models

image
image
image
image
image
image
image
image
image
image
image
image